Technical Assignments:
 
Technical Assignment 1
Compliance with ASHRAE Standard 62.1-2007
Executive Summary
   
Full Report
 
Technical Assignment 2
Building and Plant Energy Analysis According to
ASHRAE 90.1-2004 and LEED NC 2.2
 
Executive Summary
   
Full Report
 
Technical Assignment 3
Mechanical Systems Existing Conditions Evaluation
 
Executive Summary
   
Full Report

 

 

Updated November 26, 2007

________________________________________________________________________________________________________

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work- in- progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Cory Abramowicz. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

________________________________________________________________________________________________________