Katie Sennett
Construction Management

 

The Kennedy Krieger Institute

Outpatient Medical Center

Baltimore, Maryland

 

 

 

 

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.
~ Senior Thesis E-Studio

User Note:

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Katie Sennett. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 

 

Senior Thesis Presentation

 

For the last item that needed to be completed to finish thesis was to present my work that I have done for the past year. This is the results of many sleepless nights and long days of hard work. Ladies and Gentleman here is my:

SENIOR THESIS PRESENTATION!! (pdf)

SENIOR THESIS PRESENTATION!! (PowerPoint)

 

 

 

 

 

 

 

Special Thanks to: Whiting-Turner Contracting Company, Stanley, Beaman, & Sears Architect, Kennedy Krieger Institute

SENIOR THESIS | THE PENNSYLVANIA STATE UNIVERSITY | ARCHITECTURAL ENGINEERING | AE LAB | CONTACT KATIE SENNETT: kas568@psu.edu
This Page was last updated on Apr. 22, 2008 , By Katie Sennett and is hosted by the AE Department ©2007