Baltimore Washington Medical Center

Women's Center and Inpatient Tower

Glen Burnie, MD

Megan Wortman

Construction Management

line decor
line decor

 
 

User Note:

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Katherine Jenkins. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.


 
     
Final Report

Full Final Report

Table of Contents

Abstract

Acknowledgements

Executive Summary

Project Background
Architecture and General Project Information
Building Envelope
Primary Engineering Systems
Additional Engineering and Engineering Support Systems

Construction Overview
Project Delivery System
Whiting-Turner Staff
Client Information
Existing Conditions and Site Plan
Site Logistics
Project Summary Schedule
Project Cost Estimates

Technical Analysis #1
Problem Statement
Goal
Analysis Steps
Resources and Tools
Introduction to 4D Modeling
4D Modeling Process
Lessons Learned
Conclusion and Recommendations

Technical Analysis #2
Problem Statement
Goal
Analysis Steps
Resources and Tools
Composite Slab Design
Cost Analysis
Schedule
Constructability
Conclusion and Recommendations

Technical Analysis #3
Problem Statement
Goal
Analysis Steps
Resources and Tools
Existing Conditions
Thermal Quality
Structural Impact
Initial Cost Analysis
Life Cycle Cost Analysis
Schedule Durations
Conclusion and Recommendations

Final Summary and Conclusions

References

Appendix
Appendix A- Existing Site Plan
Appendix B- 4D Model Images
Appendix C-Property Windows
Appendix D-Material Quantity Takeoffs
Appendix E-Structural Systems Schedule
Appendix F- Life Cycle Cost Calculations for EIFS and GFRC
Appendix G- Façade Schedule Durations
Appendix H- Façade Systems Schedules

 

 

 

 

 

 

 

 


 
Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Megan Wortman |
This Page was last updated on September 21, 2007 , By Megan Wortman and is hosted by the AE Department ©2007