Monjia Belizaire

Construction Management

City Hospital

Southeast Pennsylvania

 

line decor
  
line decor
 
 

User Note:

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Monjia Belizaire. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 
 
 

 

Welcome to Monjia Belizaire's AE Senior Thesis e-Portfolio!

 

Final Report

The following report is the culmination of the past year's research and analysis of City Hospital Phase 1. This report includes construction depth work dealing with the advantages and disadvantages of using BIM-3D Modeling. A mechanical breadth topic of implementing LEED SS Credit 6.2 Stormwater Manangement. An electrical breadth topic of analyzing the 2 MW generators on the project was also completed. Please review the full report for more information.

Final Report (Complete)

Table of Contents

Acknowledgements

Executive Summary

Project Overview
ddfdsfdfProject Team
ddfdsfdfClient Information
ddfdsfdfProject Delivery Method
ddfdsfdfSite Plan and Existing Conditions
ddfdsfdfBuilding Systems Summary
ddfdsfdfProject Schedule
ddfdsfdfProject Cost

Depth: Building Information Modeling- 3D
ddfdsfdfBackground Information
ddfdsfdfMethodology
ddfdsfdfResearch

Analysis 1: Implementing Gold Leed® Certification
ddfdsfdfProblem Statement
ddfdsfdfMethodology
ddfdsfdfSolution

Analysis 2: Implementing Medium Voltage Generator
ddfdsfdfProblem Statement
ddfdsfdfMethodology
ddfdsfdfSolution

Conclusions

Works Cited

Appendix A: Site Plan

Appendix B: Project Schedule

Appendix C: LEED® Point Execution
ddfdsfdfStormwater Catchment System

Appendix D:  Electrical Proposal
ddfdsfdfExisting System
ddfdsfdfProposed System

 

.

 

 

 

   
Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | NSBE | Club Kreyol | Contact Monjia |
This Page was last updated on April 9, 2007 , By Monjia Belizaire and is hosted by the AE Department ©2008