Monjia Belizaire Construction Management City Hospital |
|
|||||||||||||||||
|
Welcome to Monjia Belizaire's AE Senior Thesis e-Portfolio!
Technical AssignmentsTechnical Assignment #1 is an existing conditions report which includes the following: site plan of existing conditions, project summary schedule, building systems summary, project cost evaluation, local conditions, client information, project delivery system, and staffing plan. It is intended to familiarize the viewer with the current construction environment and building systems. Technical Assignment #2 is a cost and methods analysis report which includes the following: site plan layout, detailed project schedule, assemblies estimate, detailed structural systems estimate, and general conditions estimate. This section analyzes key features of the project that affect project execution. Technical Assignment #3 is an alternative methods and research report which contains information about the critical issues facing the construction industry, these issues also face the City Hospital project. Also contained in this report are several problematic aspects of the project, an analysis that will address the problems on the project, and a weight matrix that will illustrate the analyses and core areas of investigation.
|
Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | NSBE | Club Kreyol |
Contact Monjia |
This Page was last updated on Decemeber 2, 2007 , By Monjia Belizaire and is hosted by the AE Department ©2008 |