Edward L Kelly Leadership Center, Manassas, VA  
 
 

Final Report

 

The Final Thesis Report has been submitted as of April 9. The report contains all of the research and findings throughout a year-long study into the Edward L Kelly Leadership Center. Included in the report are studies of new gravity and lateral systems as well as an architectural study to increase building size and add additional building features as well as a study into the cost and schedule of the newly proposed building.

Click the following links to access the report

Executive Sumamry

Report without Appendicies

Full Report with Appendicies

 
             

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Ryan Pletz. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

         

|| Senior Thesis Main Page || Penn State || AE || AE Labs || Contact Ryan ||

This page was last updated on May 1, 2008 by Ryan Pletz and is hosted by the AE Department ©2007