Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the infromation contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction mehtodologies for this senior thesis project are solely the interepretation of Dan Hanley. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
 

 
 

 


 
 
  Thesis Research

ASHRAE, 2007, ANSI/ASHRAE, Standard 62.1-2007, Ventilation for Acceptable Indoor Air Quality.  American Society of Heating, Refrigerating, and Air Conditioning Engineers, Inc. Atlanta, GA. 2007. This was used to determine the ventilation rates used in the system redesign.

ASHRAE, 2007, ANSI/ASHRAE, Standard 90.1-2007, Energy Standard for Buildings Except Low-Rise Residential Buildings.  American Society of Heating, Refrigerating, and Air Conditioning Engineers, Inc. Atlanta, GA. 2007. - This was used to see if the current and redesigned systems complied with this standard.

Carrier Console Heat Pump Literature.  http://www.docs.hvacpartners.com/idc/groups/public/documents/techlit/50pec-2pd.pdf - This was used to gain information about mechanical equipment that would be used in the classroom spaces of the school.

Carrier Dedicated Outdoor Air System Literature. http://www.docs.hvacpartners.com/idc/groups/public/documents/techlit/62d-1apd.pdf - This resource was used to gain information on the ventilation system that was used in the mechanical system redesign.

Carrier Heat Pump Literature. http://www.docs.hvacpartners.com/idc/groups/public/documents/techlit/ca161.pdf This was used to select the packaged heat pumps that would serve the adminstrative offices and the cafeteria area of the school in the system redesign.

Carrier Rooftop Water Source Heat Pump. http://www.docs.hvacpartners.com/idc/groups/public/documents/techlit/50rtg-2pd.pdf - This was used to provide information on the mechanical units that was used to condition the gymnasium and auditorium in the new system.

GPI Inc., 2007. Mechanical Specifications. GPI Inc., Scranton, PA. 2008. This information was used to get background on the current system and use it in the system comparison section of the report.

Mumma, Stanley, Overview of Integrating Dedicated Outdoor Air Systems with Parallel Terminal Systems.  American Society of Heating, Refrigerating, and Air Conditioning Engineers, Inc. Atlanta, GA. 2003. - This publication was used to help determine the proper set points for the ventilation system.  

PP&L Electric Utilities Corporation, Rates Schedule LP-4.  2008.  http://www.pplelectric.com/NR/rdonlyres/C17294DC-59A1-4ADC-B566-29CA965528AA/0/rate_lp4_r.pdf - This was used to determine the correct electrical rates that PP&L would charge North Pocono School District.



 
 
             