Ashburn, Virginia

 

Lindsay A. Hagemann | Construction Management Option

 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Lindsay Hagemann. Changes and discrepancies in no way imply that the orignial design conatined errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 
 
 
 
 

Final Report

Below is the final thesis report for the Mid-Atlantic Data Center 5 compiled on April 7, 2009. The report can be viewed in its entirety or by section in pdf format.

Complete Final Report

Abstract
Table of Contents
Table of Figures
Acknowledgments
Executive Summary
Introduction
Project Overview
  Client Information
  Project Delivery System
  Organizational Chart
  Project Management
Design and Construction Overview
  Building Systems
 

Local Conditions

  Site Plan of Existing Conditions
  Site Layout Planning
Project Logistics
  Milestone Schedule
  Detailed Schedule
  Project Cost Summary
  General Conditions Estimate Summary
  Detailed Structural Systems Estimate Summary
Analysis 1 | Industry and the Economy
  Background\
  Goal
  Methodology
  Resources
  Industry Analysis
  Conclusions and Recommendations
Analysis II | Alternative Conrete Construction Process
  Background
  Goal
  Methodology
  Resources
  Constuctability Analysis
  Schedule Analysis
  Cost Analysis
  Conclusions and Recommendations
Analysis III | Energy Efficient Technologies (MAE Influence)
  Background
  Goal
  Methodology
  Resources
  Thin-Film Photovoltaic System | Electrical Influence
  Economizers | Mechanical Influence
  Conclusions and Recommendations
Summary and Conclusions
Works Cited
Appendix A | Site Logistics Plans
Appendix B | Project Schedule Summary
Appendix C | Project Cost Evaluation
Appendix D | Analysis I Information
Appendix E | Analysis II Information
Appendix F | Analysis III Information
 
 
       
The Pennsylvania State University AE Senior Thesis Architectectural Engineering AE Computer Lab Contact Lindsay

This page was last updated on April 9, 2009, by Lindsay Hagemann and is hosted by the AE Department ©2008