Lighting/Electrical |
|||||||||||||||||||||
Mixed-Use Project - Metropolitan Eastern United States | |||||||||||||||||||||
|
General Building Data
Architecture
Construction - Withheld at Owner’s request. Electrical The power distribution system of this mixed-use development allows the voltage to step down to 208Y/120V and 480Y/277V (both 3 phase, 4 wire systems) at three transformer vault locations on the north side of the building. Power lines supply electricity to the main electrical room on the first floor garage. The three transformers serve a total of five switchboards. Three switchboards serve individual meter stacks in two different locations in the building. These meter stacks supply power to panels located in each apartment unit. The two remaining switchboards serve all other locations of the building including various mechanical equipment located in the ground and penthouse levels. Emergency power is provided by a 230 kW generator through two automatic transfer switches. On this system are the lighting loads for all corridors, the three elevators, and the fire pump. Lighting The majority of lighting in the building is located in apartment units on floors 1 through 9. In these units, the purpose of the system is mainly to provide illumination for the hallways, kitchen, and dining areas. There is no designed lighting for the bedrooms which will be entirely dependent on portable sources provided by the tenants. Other major lighting systems are located in more common areas, such as the residential lobby. In this space, the system incorporates a variety of types of fixtures, including wall washers, downlights, and a decorative pendant. The residential fitness area incorporates cove and peripheral lighting for a comfortable exercise environment. Mechanical The building’s heating and cooling systems use two cooling towers at a total flow of 1800 gpm to supply condenser water to heat pumps located in each individual space above the ground floor. The heat pumps provide conditioned air to the room. Heating capacities of the heat pumps range from 19,800 Btu/hr to 143,000 Btu/hr. A make-up unit on the ground floor supplies 100% outdoor air to the system. Other technical information about this component is not available because it is not included in the contract. Structural The foundation of the building consists of a mat slab with differing thicknesses of 42” and 52”. Columns transfer loads through the slab to caissons in the ground. At the top, the thickness of the caissons is 30” and at the deepest part, the thickness is 60”. On the upper floors, the slab system is a two-way flat slab with drop panels located near columns. The slab thickness varies from 8” to 12”. Where the façade shows angled bays, the columns in the walls separating units are 10x108 concrete with 20 #8 steel reinforcement bars. The deepest concrete beam is 76” with 3#10 in the bottom and 2#11 in the top section. Fire Protection Walls that separate apartment units have a fire-rating of one hour. Stair and elevator walls have a two-hour fire-rating. Sprinklers are also used throughout the building. A dry system is used in areas where there is no heating (garage levels) to prevent freezing of piping. A wet system is used elsewhere. There are two Siamese connections on the ground level for fire department access. The whole system is powered by a 75 hp fire pump located in the fire pump room located on the first floor garage.
|
||||||||||||||||||||
Senior Thesis e-Studio | PSU | AE | AE Computer Labs | Contact |
---|
This page was last updated on October 13, 2008, by Michael Gardner and is hosted by the AE Department © 2008