FINAL REPORT-

At right are the links for the Final Report submitted on May 7th, 2009.

The report presents the structural system redesign of the Gouverneur Healthcare Services. The existing, steel-framed structure was redesigned to utilize two-way flat plate concrete construction with shearwall. Two breadth studies were conducted to investigate the architectural and construction impacts of this change.



 
Final Report: Full Version

Final Report: Excluding Appendices

Final Report: Executive Summary Only
|
|
|
|
 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Scott Rabold. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design
 
This page was last updated on April 29, 2008, by Scott Rabold and is hosted by the AE Department © 2008