Arne Kvinnesland

Construction Management
Army National Guard Readiness Center
Arlington, VA

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

 

Technical Assignments

Technical Assignment 1

TO VIEW TECHNICAL ASSIGNMENT ONE PLEASE CLICK THE LINK BELOW. Technical Report One focuses on the construction and planning methods as well as the building systems used on the Army National Guard Readiness Center (ArNGRC) project in Arlington, VA. The items contained in this report are as follows: project schedule summary showing the key milestones for the project, a building systems summary highlighting the major elements of the various building systems, a project cost evaluation consisting of a comparison of an RS Means estimate, a D4 parametric estimate, and actual project cost data, a site plan highlighting existing conditions on the site, local conditions for Arlington, VA, information about the client, a discussion of the project delivery system, and concludes with a report on the staffing plan used for the project.

TECH ONE

Technical Assignment 2

TO VIEW TECHNICAL ASSIGNMENT TWO PLEASE CLICK THE LINK BELOW. Technical Report Two focuses on a cost and schedule analysis of the project. Contained in the report are: detailed project schedule, a detailed structural systems estimate, a detailed general conditions estimate, and a brief summary and review of the October 2009 PACE conference.

TECH TWO

Technical Assignment 3

TO VIEW TECHNICAL ASSIGNMENT THREE PLEASE CLICK THE LINK BELOW. Technical Report Three focuses on developing alternative methods of construction and design to deal with some of the constructability challenges associated with this project.

TECH THREE

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact STUDENT |
This Page was last updated on December 2, 2009 , By Arne Kvinnesland and is hosted by the AE Department ©2010