Figure 1. View from Yorktown Blvd.

 

 
Figure 2. View from Plaza level

 

 

 

 

 

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Benjamin Mahoney. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

Note: All images/renderings were supplied by Davis, Carter, Scott Ltd.

 

Technical Assignment II

 

Technical Assignment II involves an investigation into key features of the Marymount University 26th Street Project that affect the execution of the project.   Areas of investigation include the project schedule, site layout planning, estimated structural system costs, and general conditions costs.  Additionally, the discussions regarding critical industry issues presented at the 2009 PACE (Partnership for Achieving Construction Excellence) are summarized.