HOME
STUDENT BIO
BUILDING STATISTICS
THESIS ABSTRACT
TECHNICAL ASSIGNMENTS
THESIS RESEARCH
THESIS PROPOSAL
PRESENTATION
FINAL REPORT
REFLECTION
SENIOR THESIS e-STUDIO

 

User Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Eric Fedder. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 

 










WELCOME TO ERIC FEDDER'S
AE SENIOR THESIS E-PORTFOLIO

SENIOR CAPSTONE PROJECT:

The Capstone Project Electronic Portfolio (CPEP) is a web-based project and information center. It contains material produced from a year-long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements, click here.

CURRENT CONSTRUCTION PROGRESS:

THIS IMAGE, SUPPLIED BY EHS, DEPICTS THE CURRENT PROGRESS OF THE NEW CENTENNIAL GYMNASIUM. CLICK ON THE IMAGE TO VISIT THE OFFICIAL CENTENNIAL GYMNASIUM CONSTRUCTION WEBSITE.

CAPSTONE PROJECT NEWS:

04.25.10 -- CPEP SITE IS COMPLETE AND READY FOR FINAL REVIEW

04.25.10 -- ABET ASSESSMENT AND REFLECTIONS POSTED

04.19.10 -- THESIS FINAL PRESENTATION POSTED

04.05.10 -- THESIS FINAL REPORT POSTED

03.29.10 -- THESIS RESEARCH SOURCES POSTED

03.26.10 -- DRAFT PRESENTATION OUTLINE POSTED

02.02.10 -- PROPOSAL REVISION #2 POSTED

01.15.10 -- PROPOSAL REVISION #1 POSTED

12.14.09 -- FINAL THESIS PROPOSAL POSTED

12.01.09 -- TECHNICAL ASSIGNMENT THREE POSTED

10.27.09 -- TECHNICAL ASSIGNMENT TWO POSTED

10.07.09 -- BUILDING STATISTICS PART TWO POSTED

10.05.09 -- TECHNICAL ASSIGNMENT ONE POSTED

09.23.09 -- THESIS ABSTRACT POSTED

09.08.09 -- BUILDING STATISTICS PART ONE POSTED

09.08.09 -- STUDENT BIO POSTED

08.26.09 -- E-PORTFOLIO LAUNCHED

08.24.09 -- THESIS BEGINS

07.05.09 -- OWNER PERMISSION OBTAINED

 

 

ALL IMAGES/RENDERINGS OF THE NEW CENTENNIAL GYMNASIUM WERE GENEROUSLY SUPPLIED BY CANNON DESIGN. ALL CONSTRUCTION PHOTOGRAPHS AND INFORMATION WERE GENEROUSLY SUPPLIED BY JAMES G. DAVIS CONSTRUCTION.