THESIS RESEARCH
Project Information
- National Intrepid Center of Excellence (2010) http://www.fallenheroesfund.org/national-intrepid-center-of-excellence.aspx
Analysis I Research | Project Delivery Method
- http://www.cascadepolicy.org/bgc/build.htm - Timothy D. Hovet is Director of Real Estate Development with Sycan B Corporation in Springfield, Oregon. Mr. Hovet has used both Design/Bid/Build and Design/Build in construction projects.
- Model Based Estimating, Target Value Design: AFCbytes “Building the Future” – DPR Construction.
- Public Owners Turn to Design-Build to Tame Cost, Schedule & Rist, Chuck Dahill, President, PinnacleOne, http://designbuild.construction.com/opinions/MarketTrends/archive/0511_feature5.asp- The Risk In CM " At-Risk", Warner Strang, http://cmaanet.org/files/risk_in_cm_at_risk.pdf
- The Design-Build Process, Design- Build Soulctions, Inc.
- Designer-Led Design0Build Advantages and Drawbacks, Mark Friedlander, http://www.schiffhardin.com/binary/designer_led_adv_draw.pdf
Analysis II Research | Using BIM As A Better Communication Tool
- BIM Execution Plan, Penn State University, Dr. Mesner
- Construction Software Review, http://www.constructionsoftwarereview.com/learning_center/buyers_guides/introduction-bim-building-information-modeling/how-does-pre-constructi
Analysis III Research | 3D Estimating
- http://www.kingspanpanels.us/sitefinity/login.aspx?ReturnUrl=%2fTechnicalData.aspx
- Sutter Medical Center Castro Valley Project, DPR Construction
- AECbytese “building the future” Article, DPR Construction
Analysis IV Research | Heat Recovery Systems
- Xetec, Inc. Xetex Selection Program Version 1.1.14