Office Building - G | Eastern USA

 

                                                    Dominic Coassolo | Construction Management

 

 

 

Note:

While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

This Page was last updated on  April 27, 2011  by Dominic Coassolo and is hosted by the AE  Department © 2010

                 

 

 

           Technical Assignments          

 

 

TECHNICAL ASSIGNMENT ONE

 

 

This portion of the AE senior thesis is designed to show the existing conditions under which the building is constructed.

Technical Assignment One will provide construction data including preliminary cost estimates, a brief schedule and some of the underlying conditions of the geography and methods of construction used for the new Office Building-G.

 

 

 

 [CLICK TO VIEW PDF]

 

 

TECHNICAL ASSIGNMENT TWO

 

 

This portion of the AE senior thesis is designed to show the existing conditions under which the building is constructed.

Technical Assignment Two will provide data in relation to Technical Assignment One and will include topics that have a more detailed focus on subjects including detailed estimates of the building structure as well as more in-depth topics that pertain to the new Office Building-G. 

 

 

 

[CLICK TO VIEW PDF]

   

 

TECHNICAL ASSIGNMENT THREE

 

 

This portion of the AE senior thesis is designed to show the existing conditions under which the building is constructed.

Technical Assignment Three looks at the current building trends in the industry today and suggests applications that can be applied to the new Office Building-G through in-depth analysis.

 

 

 

 

 

[CLICK TO VIEW PDF]

 

Home

Student Biography

Building Statistics

Thesis Abstract

Technical Assignments

Thesis Research

Thesis Proposal

Presentation

Final Report

Reflection

Senior Thesis e-Studio