FINAL REPORT
This report includes the complete structural redesign of the Virginia Advnaced Shipbuilding & Carrier Integration Center using reinforced concrete. The first breadth is architectural in nature and involves a column layout redesign and an overall architectural analysis of the concrete redesign. The second branch is a cost and schedule analysis, comparing the cost of the existing structure to the redesigned structural system as well as analyzing the impact the redesign has on the construction schedule.
To view a copy of the Final Report Executive Summary click here
To view a copy of the full version of the Final Report click here