ASHA National Office 2200 Research Boulevard Rockville, MD 20850 |
Ryan Dalrymple Structures Option |
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Ryan Dalrymple. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
Presentation |
Draft Presentation Outline Posted Click Here to View |
Sample Presentation Slides Posted Click Here to View |
Final Presentation Posted Click Here to View |