Over the course of the 2012/2013 academic year, Office Building 1 of the CityCenterDC development
was analyzed to identify areas in which alternative solutions in either construction or design would
enhance the project. Through feedback from the project team, independent research, and multiple site visits, three major areas were chosen for additional analysis. The following report presents the three analyses performed as part of the final senior thesis project. It is important to note that the purpose of this thesis and analysis is strictly educational and is not intended to critique the project team in any way.

 
Executive Summary
   

 

 

 

 

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Andy Penev. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 

|
|
|
|
Contact
This page was last updated on April 22, 2013 , by Andy Penev and is hosted by the AE Department ©2012