The New RLPS Architects Offices Lancaster, PA To be completed Januray 2013
|
|||||||||||
Brice Ohl - Mechanical Option |
|||||||||||
|
Technical Report 1 is an analysis of the New Office Building for RLPS Architects and it scompliance with ASHRAE STandard 62.1-2007 section 5 and 6. Additionally, there was analysis performed on ASHRAE Standard 90.1-2007 sections 5 to 10. Technical Report 2 is an analysis of the new office building's energy consumtpion and HVAC loads. An energy model was created in conjunction with this report and compared to values obtained by the project engineer's simulation. Technical Report 3 is a summary of the mechanical systems for the New Office Building for RLPS Architects. |
||||||||||
The Capstone Project Electronic Portfolio (CPEP) is a web‐based project and information center. It contains material produced for a year‐long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements click here. | |||||||||||
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Brice Ohl. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |