Presentation

Power Point

PDF Format

 

Total Time: 12 – 14 Minutes

Total Slides: 30 - 34
Outline:

Title Slide: 30 sec

Project Overview: 1 min

Analysis Topics/Overview: 30 sec

Analysis 1 (Prefabrication of Plumbing Rough-In with Interior wall panels.) – 3 min
Title Slide - 1 Slide
Background Information – 1 Slide
Methodology – 2 Slides
Results 3-4 Slides

Analysis 2 (Installation of Solar Panels and Structural/Electrical Breadths) – 3 min
Title Slide - 1 Slide
Background Information – 1 Slide
Methodology – 2 - 3 Slides
Results 4 – 5 Slides

Analysis 3 (Schedule Acceleration through SIPS) – 3 min
Title Slide - 1 Slide
Background Information – 1 Slide
Methodology – 2 Slides
Results 3 – 4 Slides

Analysis 4 – Resequencing of Project Schedule – 2 min

Title Slide - 1 Slide
Methodology – 2 Slides
Results 2 - 3 Slides

Conclusion and acknowledgements – 1 min

*I will mention both breadths but only presenting electrcal



 News and Updates

CPEP Complete 5/5/2014

ABET Assessment Posted 4/23/2014

Presentation Posted 4/23/2014

Final Report Posted 4/9/2014

Presentation Outline Posted 4/2/2014

Revised Proposal Posted 2/7/2014

Proposal Posted 12/16/2013

Technical Assignment 2 Posted 12/16/2013

Technical Assignment 1 Posted 12/16/2013

Building Statistics Part 2 Posted 10/25/2013

Abstract Posted 10/21/2013

Building Statistics Part 1 Posted 10/1/2013

Owner Permission Obtained 6/17/2013

Preliminary CPEP Draft 9/6/2013

CPEP Launched 9/12/2013






 

 
   

Note: While great efforts have been taken to provide accurate and completeinformation on the pages CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Ian Bower. Changes and discrepancies in no way imply that the original design contained errors or was flawed. differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

This page was last updated on 5/5/2014, by Cameron Mikkelson and is hosted by the AE Department ©2013

  Links
Senior Thesis Main Page
Penn State
Architectural Engineering Department
AE Computer Labs
Contact Me