Structures Facilities Structures Research Structures Professors Structures Home Structures Facilities Structures Grad Program Kavanagh Lectures Structures Facilities Structures Grad Program Kavanagh Lectures Structures Facilities Structures Grad Program Structures Grad Program Structres Links Structures Seminars Structures Short Courses Structures Grad Program Structres Links Structures Seminars Structures Short Courses

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
     
   

 

 
Project Title: Prefabricated Concrete Bridge System
Investigator: Dr. Andrew Scanlon, Dr. Alex Aswad
Research Assistants: Joshua Brighton, Bong-Seob Choi,
  John Newell
Funding Agency: The Pennsylvania Department of Transportation
   
Project Duration: January 1995 - January 2000
References: Precast Post-Tensioned Abutment System for Rapid on-Site Condtruction, TRB Annual Convention, Washington, January 2002
   
   

In a project sponsored by the Pennsylvania Department of Transportation, Penn State developed a short span prefabricated bridge system to speed construction of new and replacement bridges. The concept consists of adjacent double cell box beams supported on precast concrete abutment units. The concrete abutment units have a double-T counterfort configuration and are post-tensioned to cast-in-place footings or pile caps. Two demonstration bridges were constructed in Summer 2000 and PennDOT will monitor performance in situ.

       
     