Thesis Research
Interviews | Jason Reece, Balfour Beatty, Provided insight regarding 3D coordination implementation Craig Dubler, PSU Graduate Student, 3D coordination process information as well as anecdotal evidence for value of the process |
Websites | www.highconcrete.com Utilized information provided here for structural and mechanical calculations and gathered precast connection details www.nitterhouse.com Utilized information provided here for structural and mechanical calculations and gathered precast connection details http://www.aecbytes.com/feature/2008/MPSforBIM.html Gathered information related to Model Progression Specification www.meanscostworks.com Utilized information for cost estimates in technical assignments as well as for proposed new construction items |
Journal Paper | Leicht, R., J. Messner. "Moving toward and 'Intelligent' shop modeling process". ITCon, Vol. 13 (2008), Pg. 286 Gained insight on 3D outcomes and the overall 3D coordination process |