Thesis Research

Interviews

Jason Reece, Balfour Beatty, Provided insight regarding 3D coordination implementation

Craig Dubler, PSU Graduate Student, 3D coordination process information as well as anecdotal evidence for value of the process

Websites

www.highconcrete.com Utilized information provided here for structural and mechanical calculations and gathered precast connection details

www.nitterhouse.com Utilized information provided here for structural and mechanical calculations and gathered precast connection details

http://www.aecbytes.com/feature/2008/MPSforBIM.html Gathered information related to Model Progression Specification

www.meanscostworks.com Utilized information for cost estimates in technical assignments as well as for proposed new construction items

Journal Paper Leicht, R., J. Messner. "Moving toward and 'Intelligent' shop modeling process". ITCon, Vol. 13 (2008), Pg. 286 Gained insight on 3D outcomes and the overall 3D coordination process