References

 

Bibliography:

Altus Group. Carboncast Precast Architectural Cladding Panels. Brochure. Lacaster, PA: Author, 2006. Carboncast. Apr. 2006. Altus Group. Jan. 2009; http://www.altusprecast.com/uploads/ 1137682951/Downloads-PDF-Docs/AG_AP_brochure8b.pdf>.

Autodesk Corporation, Inc, comp. BIM’s Return on Investment. Rep. 2007. Autodesk, Inc. March & april 2009; http://images.autodesk.com/adsk/files/bim_roi_jan07_1_.pdf>.

Carpenter, Dave, and Suzanna Hoppszallern. "Boom going bust? Credit and financial crisis make for uncertain hospital construction outlook."; HFM Magazine Feb. 2009. Health Facilities Management Online. Feb. 2009. 20 Mar. 2009 http://www.hfmmagazine.com/hfmmagazine_app/jsp/articledisplay.jsp?dcrpath=HFMMAGAZINE/Article/data/ 02FEB2009/0902HFM_FEA_CoverStory&domain=HFMMAGAZINE>.

Dunston, Philip S., Laura L. Arns, and James D. McGlothlin. AN IMMERSIVE VIRTUAL REALITY MOCK-UP FOR DESIGN REVIEW OF HOSPITAL PATIENT ROOMS. Publication. 23 Oct. 2007. Purdue University. Jan. 2009; http://www.envision.purdue.edu/pdfs/papers/01_Dunston_submission_45.pdf.

HFMA, and GE Healthcare Financial Services. Financing the Future Project: Healthcare Construction Trends and Capital Implications. Publication. 2008. Healthcare Financial Management Association, GE. Feb. 2009; http://www.hfma.org/NR/rdonlyres/50B6AC7F-4B08-4B22-9E9F-D8CD1D071BB3/0/400601FNFIIIrpt4.pdf>.

High Concrete Structures, Inc. Architectural PRECAST CONCRETE Technical Data. Brochure. Denver, PA: Author.

Hill-rom Services, Inc. Hill-Rom® Design Services: RoomBuilder. Brochure. Author. Design Services: RoomBuilder. 23 July 2008. Hill-Rom Corporation. Mar. 2009; http://www.hill-rom.com/usa/Design_RoomBuilder.htm>.

Riley, Dr. David R., Priya Varadan, and H. Randolph Thomas. Benefit-Cost Metrics For Design Coordination of MEP Systems in Multi-story Buildings. Publication. Vol. 1. ASCE.

Khanzode, Atul, Dr. Martin Fischer, and Dean Reed. BENEFITS AND LESSONS LEARNED OF IMPLEMENTING BUILDING VIRTUAL DESIGN AND CONSTRUCTION (VDC) TECHNOLOGIES FOR COORDINATION OF MECHANICAL, ELECTRICAL, AND PLUMBING (MEP) SYSTEMS ON A LARGE HEALTHCARE PROJECT. Rep. Ed. T. Olofsson, G. Lee, and C. Eastman. June 2008. Standford University, DPR. 2 Mar. 2009; http://www.itcon.org/data/works/att/2008_22.content.04920.pdf>.

RSMeans2007 Open Shop Building Construction Cost Data. 23rd ed. Kingston, MA: Reed Construction Data, Inc., 2006.

Wisker, Vaughn, Tim Shaw, and Anthony Baratta. Using Full-Scale Virtual Mockups for Nuclear Power Plant Training. Rep. The Pennsylvania State University Applied research Lab. 3 Mar. 2009; http://tauon.nuc.berkeley.edu/ references/2005_11_ANS_DC/PDFFILES/PAPERS/110-111.pdf>.

 

 

Company Contacts:

Altus Group

High Concrete Group

A.W. Lookup

HSC Builders & Construction Managers

Hill-Rom Corporation

 

 

 
This page was last updated on 04/22/2009 , by Ryan Klinicki and is hosted by the AE Department ©2008