Text Box:

 

 

Zachary Haupt—Mechanical Option

McDonogh School Campus Green Project

Owings Mills, MD

This page was last updated on October 11, 2010, by Zachary Haupt and is hosted by the AE Department © 2010.

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Zachary Haupt. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

Technical Assignments

Text Box: Tech Report 1 analyzes the Student Center’s compliance with ASHRAE Standards 62.1-2007 & 90.1-2007
Click here to download a pdf version of Tech 1 Report
Text Box: Tech Report 2 contains an energy model analysis for the Student Center
Click here to download a pdf version of Tech 2 Report
Text Box: Tech Report 3 contains a summary of the mechanical systems located in the Student Center
Click here to download a pdf version of Tech 3 Report