Amt, Michelle.  (16 January 2012).  William McDonough + Partners.  (A. Ward, Interviewer)

  • This interview helped to establish an understanding of key considerations for a building integrated photovoltaic curtain wall.

 

BIM Guide for Facility Management.  GSA.  PDF.

  • This document discusses the value of BIM for FM and current case studies.

 

Bolt, David.  (10 January 2012).  Balfour Beatty Construction. (A. Ward, Interviewer)

  • This interview provided necessary background information on the GOC schedule and need for BIM on site.

 

Building Integrated Photovoltaics.  Onyx Solar.  PDF.

  • This document provides basic performance data for the proposed photovoltaic curtain wall system.

 

Carr, Tim.  (23 January 2012).  Heery International.  (A. Ward, Interviewer)

  • This interview helped to define key benefits to having an engaged owner on a project.

 

DeVito, Steve.  (17 January 2012).  GSA.  (A. Ward, Interviewer)

  • This interview helped to define the value of BIM for FM.

 

Dubler, Craig.  (20 January 2012).  Penn State OPP.  (A. Ward, Interviewer)

  • This interview helped to define the value of BIM for FM.

 

DYWIDAG Strand Anchor Systems.  DYWIDAG-Systems International.  PDF.

  • This document provided data on the steel tendons used in the progressive collapse prevention system design.

 

Konchar, Mark.  (17 January 2012).  Balfour Beatty Construction.  (A. Ward, Interviewer)

  • This interview supported the engaged owner research effort.

 

Mounting Rack: Sunny Tower-US ST6US/ST36/ST42/ST48 Installation Guide.  SMA.  PDF.

  • This document provides technical data pertinent to the photovoltaic curtain wall design.

 

Phelps, Andreas.  (17 January 2012).  Balfour Beatty Construction.  (A. Ward, Interviewer)

  • This interview supported the engaged owner research effort.

 

Reece, Jason.  (16 January 2012).  Balfour Beatty Construction.  (A. Ward, Interviewer)

  • This interview supported the BIM implementation analysis.

 

"Short Interval Production Schedule (SIPS)." Pentagon Renovation Program. Web. 19 Jan. 2012. <http://renovation.pentagon.mil/wedge2-5/sips.htm>.

  • This website includes the non-traditional SIPS example image used.

 

Solnosky, Ryan.  (24 January 2012).  Penn State AE Graduate Student.  (A. Ward, Interviewer)

  • This interview provided the understanding needed to conduct the progressive collapse prevention design.

 

Top Ways Ideate BIMLink Saves Hours, Days – Even Weeks.  Ideate.  PDF.

  • This document identifies some of the key benefits of Ideate BIMLink.

 

Unified Facilities Criteria - Design of Buildings to Resist Progressive Collapse.  Department of Defense.  PDF.

  • This document contains substantial information and guidelines for progressive collapse prevention system design.

 

Whalen, Jesse.  (19 January 2012).  Balfour Beatty Construction.  (A. Ward, Interviewer)

  • This interview supported the BIM implementation analysis.