REFLECTION

The AE Senior Thesis turned out to be an edifying process. It was nice to get to work on a real building and hear criticisms of that work from the members of faculty. I do wish there had been more opportunities for the BIM Thesis program however. With the industry trending toward a more integrated design approach, I feel like having a collaborative project with students of different options would have been incredibly helpful. All in all, this thesis is a neat opportunity to try out new things that may not have been covered much in our ordinary coursework, and I thought that was great.

 

 

ABET ASSESSMENT

Click here to download the ABET Assessment survey

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Lorenz. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

This page was last updated on Wednesday, September 7, 2011
Click Here!