final report

This Final is an analysis of the central utility plant and an examination of cogeneration.

click here to download the full report in PDF form

click here to download the executive summary

 

 

 

 

 

 

 

 

 

 

 

While great efforts have been taken to provide accurate and complete information on the pages of cpep, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of thomas chirdon. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
this page was last updated on september 17, 2008, by thomas chirdon and is hosted by the ae department ©2008