Progress Log
| Date | Announcement |
| 4.11.07 | Final Report Posted |
| 4.02.07 | Faculty Consultation with Professor Dannerth (Electrical) |
| 3.19.07 | Faculty Consultation with Professor Holland (Architectural) |
| 3.19.07 | Faculty Consultation with Professor Dannerth (Electrical) |
| 2.16.07 | Preliminary Electrical and Lighting Depth Work Submitted |
| 2.07.07 | Faculty Consultation with Professor Holland (Architectural) |
| 2.05.07 | Thesis Proposal Updated |
| 1.30.07 | Faculty Consultation with Professor Dannerth (Electrical) |
| 1.15.07 | Started part 2 of thesis coursework |
| 12.12.06 | Technical Assignment 3 Updated |
| 11.28.06 | Posted Tech 1: Daylight Studies |
| 11.28.06 | Technical Assignment 2 Updated |
| 11.21.06 | Posted Technical Assignment 3 |
| 10.27.06 | Posted Techanical Assignment 2 |
| 10.25.06 | Technical Assignment 1 Updated |
| 10.06.06 | Posted Technical Assignment 1 |
| 10.06.06 | Posted Thesis Abstract |
| 9.22.06 | Posted Complete Building Statistics |
| 9.15.06 | Posted Lighting Proposal Memo |