| 12.16.06 | Reviewed/Updated Webpage |
|---|---|
| 12.15.06 | Posted Thesis Proposal |
| 12.13.06 | Obtained feedback from advisor |
| 12.7.06 | Contacted Enclosure Manufacturer |
| 12.4.06 | Emailed advisor with Proposal ideas |
| 12.3.06 | Reviewed/Updated Webpage |
| 11.21.06 | Turned in Technical Assignmnet 3 |
| 11.7.06 | Reviewed/Updated Webpage |
| 10.27.06 | Turned in Technical Assignmnet 2 |
| 10.18.06 | Met with advisor for questions |
| 10.9.06 | Turned in Technical Assignmnet 1 |
| 9.27.06 | Received Specifications from B&H |
| 9.26.06 | Received MEP drawings from AKF |
| 9.25.06 | Seeked assistant from AE faculty member |
| 9.20.06 | Met with advisor to introduce building |
| 9.14.06 | Received Architectural drawings from B&H |
| 9.13.06 | Received Civil drawings from Vollmer |
| 9.7.06 | Contacted Domus' Superintendant |
| 9.7.06 | Contacted Domus' Project Manager |
| 9.7.06 | Contacted AKF Engineers |
| 9.7.06 | Contacted Vollmer Associates |
| 9.5.06 | Fall 2006 Semester Begin |
| 9.1.06 | Received Geotechnical Report from M&R |
| 8.28.06 | Contacted McClymont & Rak |
| 8.14.06 | Contacted Brawer & Hauptman |
| 8.11.06 | Received Structural drawings from O&D |
| 8.11.06 | Meet with Domus' Superintendant |
| 8.9.06 | Received Owner's Permission Form |
| 8.7.06 | Contacted O'Donnell & Naccarato |
| 8.2.06 | Photographed interior/exterior of building |
| 8.4.06 | Contacted Teres Holdings |
| 7.28.06 | Building walk-through while under construction |
| 7.25.06 | The Hub on Chestnut selected as Thesis Building |