Derek DiPiazza

Construction Management
Warrenton Aquatics and Recreation Facility
Warrenton, Virginia

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Derek DiPiazza's AE Senior Thesis e-Portfolio

Final Report

Full Report

Construction Ethics Training Program

Cover Page

Abstract

Table of Contents

Acknowledgments…………………….........…….......……….1

Executive Summary…………………….......…………………2

Project Introduction……………….......…........……………….3

Project System Descriptions……………........……………3-8

Project Team Summary…………………...........…………9-12

Existing Conditions Report......…………................…….13-14
Local Conditions
Site Layout

Project Logistics…………………………..…..……………...15
Project Schedule
Project Cost Summary


Analysis 1- Construction Ethics
………….........….………16-30
Problem
Goal
Methodology & Tools
Ethical Need Survey Analysis
Ethical Training Guide Development
Ethical transgressions
Exit Survey Analysis
Conclusion

Analysis 2- Fabric Duct System……………….….............31-39
Problem
Goal
Methodology & Tools
Design
Cost Analysis
Schedule Analysis
Structural Analysis
Conclusion

Analysis 3- Column Redesign………….............…..……40-45
Problem
Goal
Methodology & Tools
Steel Design
Pilaster Design
Cost Analysis
Schedule Analysis
Constructability Analysis
Conclusion

Thesis Recommendations……….....…………….......………..46

Appendix A……………………..……………………...……....47-51

Appendix B…………………...………………………….….....52-59

Appendix C………….………….……………………………….….60

Appendix D………………………………………………….….61-64

Appendix E……………………………...……………………….….65

Appendix F……………………………..………………………..66-67

Appendix G…………………………………………………….…68-69

 

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated on May 3, 2007 , By Student Name and is hosted by the AE Department ©2005