Army National Guard Readiness Center
Arlington, Virginia
Amanda C. Farace
Structural Option
AE Senior Thesis 2009 I 2010
 

Final Report

This section will be updated byApril 2010. Sorry for the inconvenience.

User Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Amanda Farace. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
This page was last updated on October 6, 2009, by Amanda Farace and is hosted by The Pennsylvania State University AE Department ©2009