Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Nicholas Ziegler. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
|
Final Report
The primary goal of this report was to redesign the structural system using post-tensioned concrete instead of steel.
The following report is a culmination of the past year's research and analysis of Building A.
Click here to vew a copy of the executive summary.
Click here to view a copy of the final report. |
|