Christopher M. DiLorenzoConstruction Option2010-2011 |
Butler Health SystemNew Inpatient TowerAddition & RenovationButler, PA |
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher DiLorenzo. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
FINAL REPORT |
Senior Thesis Home Page Pennsylvania State University Architectural Engineering Contact Me
This Page was last updated on April 21st, 2011 by Christopher DiLorenzo and is hosted by the AE Department © 2010
|
[Final Report] The final report presents the three analyses topics explained in the thesis proposal: Application of a Photovoltaic system, MEP prefabrication, and Increasing BIM Usage. This report details the steps of the analysis along with the final conclusions and recommendations. |