THESIS PROPOSAL

WESTINGHOUSE BUILDING 4
CRANBERRY, PA

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Jonathan Fisher.  Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

The Purpose of the Final Proposal is to explain the topics that will be investigated for change in the second part of AE Senior Thesis.  Also, the resources and techniques used to obtain this information are laid out.  Schedule and Sustainable techniques are the main areas that are discussed in this proposal.

The Revised Final Proposal takes into account any problem areas that were discovered after consulting our thesis advisors.  The only change made to this proposal is the addition of an updated Time Management timeline.  This changed can be viewed in Appendix B of the document. 

The Breadth topics that will be covered through are 4 analyses are explained in the Breadth Studies of the final proposal.

The Revised II Final Proposal shows that the project phasing depth of the final report was dropped.  The Timeline was adjusted accordingly and the Proposal was reposted.