Technical Assignments

Technical Assignment 1

 

September 23, 2011:

This assigments is to illustrate and provide a comprehensive background about the Sterling and
Francine Clark Art Institute through analyses of schedules, different types of estimates,
investigations, and evaluations.

Technical Assignment 2

 

October 19, 2011:

The second technical report is to give a more in depth approach to the some of the information
and systems developed in the previous technical report.

Technical Assignment 3

 

November 16, 2011:

The THIRD technical report provides an analysis of the Sterling and Francine Clark Art Institute in several different aspects. Contacting the Turner owner representative, various issues were analyzed which involves constructability issues, schedule acceleration scenarios, and value engineering topics.


Notes

While great efforts have been taken to provide accurate and complete information on the
pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress
for this thesis project. Modifications and changes related to the original building designs and
construction methodologies for this senior thesis project are solely the interpretation of Christopher
Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was
flawed. Differing assumptions, code references, requirements, and methodologies have been
incorporated into this thesis project; therefore, investigation results may vary from the original
design.