Student Biography
Building Statistics
Thesis Abstract
Technical Assignments
Thesis Research
Thesis Proposal
Presentation
Final Report
Reflection
e-Studio Website

User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Mr. Bell. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorportated into this thesis project; therefore, investigation results may vary from the original design.

This page was last updated on May 2, 2010 , By Chris Bell and is hosted by the AE Department ©2009
Thesis Research

AGI 32 EDU. Vers. 2.0. Computer software

AIA California Council. (2007, May 1). Integrated Project Delivery: A Working Definition. McGraw Hill Construction.

Altman, K. (2010, April 5). Thames St. Wharf Curtain Wall Square Foot Costs. (C. Bell, Interviewer)

Autodesk, Inc. (2009). Kling Stubbins & Tocci Building Companies. Retrieved February 17, 2010, from http://usa.autodesk.com/adsk/servlet/item?siteID=123112&id=12902887&linkID=10274604

Cherry, F. A., & Petronis, A. A. (2009, September 02). Architectural Programming. Retrieved March 30, 2010, from http://images.google.com/imgres?imgurl=http://www.wbdg.org/images/archprogramming_1.jpg&imgrefurl=http://www.wbdg.org/design/dd_archprogramming.php&usg=__97CTIPZQfXN9hyfGdK8-wm9yBtU=&h=215&w=325&sz=13&hl=en&start=4&sig2=WivUS2tsEFpblq7J0z5RpQ&um=1&itbs=1&

Curtiss, Peter S. Heating and Cooling of Buildings. Vers. 2nd Ed. The McGraw-Hill Companies, 2002. Computer software.

Dr. Richard A. Behr, P. (2010). Building Enclosure Science & Design, AE 542 Spring 2010 Class Notes.

Duke, P. E. (2010, March 22). Program Manager, KLMK Group. (C. C. Bell, Interviewer)

Harwick, B. (2010, March 20). Thames St. Wharf Mechanical System. (C. Bell, Interviewer)

Herschauer, D. (2010, March 30). Thames St. Wharf Mechanical System Installation. (C. Bell, Interviewer)

Integrated Project Delivery. (n.d.). Retrieved February 10, 2010, from Constructech.com: http://www.constructech.com/news/articles/article.aspx?article_id=7619

Kenig, M., Tocci, S. J., & Frey, S. J. (2009, February 26). IPD: Lessons from the Trenches. AGC of America Webinar Series . AGC of America.

Kerr, D. (2010, February 11). Project Delivery Influence Benefits . The M Files .

Kibert, C. J. (2008). Sustainable Construction Green Building Desgin and Delivery (2nd ed.). Hoboken, New Jersey: John Wiley & Sons, Inc.

Kreider, J. F., Curtiss, P. S., & Rabl, A. (2002). Heating and Cooling of Buildings Design for Efficiency. New York, NY: McGraw Hill.

Lachmi Khemlani, P. (2009, March 6). AECbytes.com. Retrieved February 25, 2010, from Sutter Medical Center Castro Valley: Case Study of an IPD Project: http://www.aecbytes.com/buildingthefuture/2009/Sutter_IPDCaseStudy.html

MacLeamy, P. (2004, August). MacLeamy Curve. Retrieved from www.msa-ipd.com: http://www.msa-ipd.com/MacleamyCurve.pdf

Mathews, O., & Howell, G. A. (2005). Integrated Project Delivery an Example of Relational Contracting. Lean Construction Journal , 2 (1), 46-61.

Quirouette, Rick. The Heat, Air and Moisture Building Science Toolbox. Vers. 1B-E/U-(11). 1999. Computer software.

Rousseau, B. (n.d.). Autodesk AEC Headquarters. Retrieved February 25, 2010, from Hq.construction.com: http://hq.construction.com/case_studies/0912_autodesk.asp

Tocci Building Corporation. (2010). Benefits of IPD. Retrieved February 17, 2010, from http://www.tocci.com/index.php?option=com_content&view=article&id=335&Itemid=366

YKK AP American Inc. (2008). YCW 750 IG Inside Glaze Curtain Wall System. YKK Construction Product Date .