Text Box:

J.B.Byrd Alzheimer's Center

Tampa, Florida

Text Box: Text Box: Final Report

Image Courtesy of HDR, Inc.

Text Box:

Final Report

Rounded Rectangle:

This page was last updated on 04/04/12 by Raffi Kayat and is hosted by the AE Department ©2011

The main depth of this report consisted of analyzing two systems after the building was relocated to San Diego, California. One fixed base one way system with special concrete shear walls and intermediate moment frames. One isolated base with the same lateral system mentioned above. The purpose of the two designs was to compare how one conventional system performs versus a high tech system. Also, they were both required to meet S-5 and S-3 rating from ASCE 41-06.

Also Included are two breadths consisting of a construction management breadth and a sustainability viability study. The construction breadth focused on cost and schedule of the redesigns system in order to compare and rate the systems. The sustainability breadth focused on the feasibility of switching to an integrated photovoltaic curtain wall.

 

To view the final report please click on the thumbnail to the right.

Final Report