Brett Miller | Senior Thesis ePortfolio | 2013-2014

Office Building
Washington, D.C.

Brett Miller
Construction Management

Rendering Courtesy of DAVIS

Abstract

     
 
 
 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Brett Miller. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
 
 
This page was last updated on September 23, 2013, by Brett Miller and is hosted by the AE Department ©2013