Kevin Clouser
Structures
The Harry and Jeanette Weinberg Center
at Mercy Hospital
Baltimore, Maryland

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Kevin's AE Senior Thesis e-Portfolio

Final Report

This repots covers information researched and developed over the past semester of work. It includes descriptions of the existing building conditions, general architecture, and other building systems. The problem of reducing the buildings height by ten feet is answered by designing a post-tensioned concrete structure. Econimics of both projects are then compared to determine if the the project economics of both buildings are similar.. Also included are investigations into acoustical and lighting design changes that would occur when the ceiling heights were lowered.

Executive Summary

Main Report

Acoustical Design

Lighting Design

Full Report

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated on September 20, 2006 , By Student Name and is hosted by the AE Department ©2005
September 20, 2006