● “Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Matthew Hoerr. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.”

Final Report

 

Complete Final Report

This is the final report consisting of all of this years research. It includes all appendices an information on my research and breadth topics. Research is on Green Schools and why more aren't being built. Other topics include a precast facade analysis with a mechanical breadth and a redesign of the gymnasium lighting.

Executive Summary

This is a summary of this past semesters research. This quickly summarizes my green school research, my precast facade analysis, and my redesign of the gymnasium lighting.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Senior Thesis Main Page | Penn State | Architectural Engineering Homepage | AE Computer Lab | Contact

This page was last updated on May 2, 2008, by Matthew Hoerr and is hosted by the AE Department ©2007