Header image  

Construction Management

Carl J. & Ruth Shapiro Cardiovascular

Center at Brigham & Women's Hospital

Boston, Massachusetts

 
 
 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Sami Boulos. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
 
Final Report

Above is the link to the Final Thesis Report created for the Department of Architectural Engineering.

Please refer to the Presentation Tab to view the Final Presentation that will be given on April 14th, 2008 at 3:40pm to the AE Jury.

 


 
 

 
             
|Senior Thesis| |The Pennsylvania State University| |Architectural Engineering| |AE Lab| |Contact Sami Boulos|