William D. Cox

Construction Management

1099 New York Avenue

Washington, D.C.

 
*Page is Best Viewed in Internet Explorer

 

User Note:

“Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of William Cox. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.”

   
Final Report

 

Below is the final thesis report for the project at 1099 New York Avenue as compiled by Will Cox on April 9, 2008. The report can be viewed in its entirety or by section.

 

Complete Final Report (pdf)

 

Abstract (pdf)

 

Acknowledgements (pdf)

 

Executive Summary (pdf)

 

Project Overview (pdf)

Project Team

Client Information

Project Delivery

Site Plan and Existing Conditions

Building Systems Summary

Project Schedule

Project Costs

 

Analysis I - Achieving Sustainability (pdf)

Background

Problem

Objective

Analysis Part I - Evaluation of Current Credits Obtained

Analysis Part II - Evaluation of Credits to be Obtained

Conclusion & Recommendations

 

Analysis II - Energy Considerations for Green Roofs (pdf)

Background

Problem

Objective

Analysis

Cost Impact

Conclusion & Recommendations

 

Analysis III - Structural Considerations for Green Roofs (pdf)

Background

Problem

Objective

Analysis

Cost Comparison

Schedule Impact

Conclusion & Recommendations

 

Analysis IV - Mapping the Mep Coordination Process (pdf)

Background

Problem

Objective

Analysis Part I

Understanding Waste

The Dynamic Systems Model

The 2D Design Coordination Process

The 3D Design Coordination Process

Analysis Part II

Testing the 3D Design Coordination Process

Evalutating the Test Results

Conclusion & Recommendations

 

Appendix A - Project Site Plan (pdf)

Appendix B - Detailed Project Schedule (pdf)

Appendix C - Daylighting & Views Calculations (pdf)

Appendix D - Structural Hand Calculations for Slab Redesign (pdf)

Appendix E - 3D Coordination Schedule Comparison (pdf)

 

 



 
     

Senior Thesis Home Page | Dept. of Architectural Engineering | AE Computer Labs | The Pennsylvania State University | Contact Me

This page was last updated on April 9, 2008 by William D. Cox and is hosted by the AE Department ©2007