Mechanical Option
Geisinger Hospital for Advanced Medicine
Danville, PA

 

 
line decor
  
line decor

 
 
 
 

 

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.


 
 
FINAL REPORT

 

The final report of the redesign of the mechanical system of the Geisinger Hospital for Advanced Medicine is posted below.

Thesis Final Report (pdf)

Appendix A (pdf)

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This page was last updated on September 4, 2008, by Jen Redington and is hosted by the AE Department ©2008