User Note:
 
    Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, 
  please be aware that the information contained herewith is considered a work-in-progress for this thesis project. 
  Modifications and changes related to the original building designs and construction methodologies for this 
  senior thesis project are solely the interpretation of Samir Al-Azri. Changes and discrepancies in no way 
  imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, 
  and methodologies have been incorporated into this thesis project; therefore, investigation results may 
  vary from the original design.