Westinghouse Electric Company Nuclear Power Engineering Headquarters Campus

Cranberry Twp, PA

  Mark Speicher / Architectural Engineering / Construction Management Option  
 

Presentation

A copy of the presentation can be downloaded as either a Powerpoint file or as a PDF.

Senior Thesis Presentation- PPT version

Senior Thesis Presentation- PDF version

 
   

 

User Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Mark Speicher. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
 
This page was last updated on September 8, 2009, by Mark Speicher and is hosted by the AE Department ©2009