Unknown Data Center Expansion

Somewhere, USA

Daniel Suter - Construction Management Option

Home
Student Bio
Thesis Abstract
Thesis Research
Thesis Proposal
Presentation
Final Report
Reflection
Senior Thesis e-Studio
PSU
Thesis
Turner
Arch
Research
 

Analysis #1:

FiberLite Roofing Solutions
RS Means Costworks 2011
Sanyo Electric
Sunny Tower
WBDG – wbdg.org
NEC – National Electric Code 2009
Green Building: Project Planning &Cost Estimating

Analysis #2:

RS Means Electrial Costworks
RS Means Mechanical Costworks

Analysis #3:

Brian Brunett – AE Student
RS Means Costworks
American Institute of Steel Construction Inc.
Vulcraft Catalog
International Code Council 2006 - ICC

Analysis #4:

Latista Technologies
Vela Technologies
Tekla.com

AE Senior Thesis
The Pennsylvania State University
Architectural Engineering AE Computer Labs
Contact Dan Suter

NOTE: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Daniel Suter. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

This page was last updated on 09/24/2010, by Daniel Suter and is hosted by the AE Department ©2010