Joshua Zolko Structural Option |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
Building Statistics General Information Location: Hershey, PA Primary Project Team: Owner: Milton S. Hershey Medical Center Architectural Overview Building consists of regular, alternating concrete walls with horizontal black windows, complimenting existing buildings on the campus. A cylindrical tower starts at the second floor and rising to the top of the building. Columns support this cylinder at the first floor, allowing an entrance just underneath. Major National Model Codes:
Building Enclosure Structural The Milton S. Hershey Medical Center Biomedical Research Building is a 7 story tall, monolithic concrete structure composed of one way 12” deep concrete slabs and various sizes of reinforced concrete columns, about 22”x22” using rebar sizes ranging from #7’s to #11’s of 60ksi steel. Columns are arranged in 31’ x 20’ bays for most of the building. Concrete is of 4000psi strength. The Biomedical Research Building sits on a deep foundation system of large caissons 3’ to 7’ in diameter. Grade beams from 6’ to 16’ in depth are used to compensate for column loads that do not line up with caissons. Mechanical 8 Model 365 air handler units on the roof supply in the Biomedical Research Building, supplying an unknown amount of air to the building. Lighting/Electrical The building has 480y/277v phase electrical systems for most of the building of various strengths. Lighting is supplied largely by F40SPx35 fluorescent bulbs in GE Maxi-Miser II ballasts. Fire Protection Fire protection is not a large concern with a concrete system, though protection for other walls that are not of concrete are done with 2 hour fire ratings. A sprinkler system is utilized to protect the building from fire. Transportation There are two elevators, 1 at each end of the building for ease of access to all floors, up to the 7th floor. Next to these elevator shafts are two additional stairwells, and one more located by the southeast corner of the building. Construction Construction of the Milton S. Hershey Medical Center Biomedical Research Building was done on a bid-build project, and took about 2 years to finish, from 1991 to 1993. The total cost was $49 million. Construction was overseen by Alvin H. Butz, Inc. and carried out by Alexander Building and Shoemaker. |
|
||||||||||||||||||||||||||||||||||
User Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis poject are solely the interpretation of Joshua Zolko. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements and methodologies have been incorporated into this thesis poject; therefore, investigation results may vary from the original design. | |||||||||||||||||||||||||||||||||||
|