Phase 2 New Building

John Tyler Community College, Midlothian, VA

 

DENNIS V. WALTER JR.

Construction Management Option

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

 

Technical Assignments

 

Technical Assignment 1 -

This technical assignment analyzes many aspects of the Phase 2 New Building.  The analysis includes the
project schedule summary, building systems summary, project cost evaluation, site plan of existing 
conditions, local conditions, client information, project delivery system, and a staffing plan for the 
construction manager. 

Technical Assignment 2 -

This technical assignment analyzes many key aspects of the Phase 2 New Building Project's Execution.  This includes a detailed project schedule, site layout planning, detailed structural systems estimate, a general conditions estimate, and current critical industry issues.

Technical Assignment 3 -

This technical assignment allows identification of areas within the Phase 2 New Building Project that are good candidates for research, alternative methods, value engineering, and schedule compression. These will form the basis of the final thesis proposal.

 