Jessica Lucas

Mechanical Option
731 Lexington Avenue
New York, NY

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Jessica Lucas's AE Senior Thesis e-Portfolio

Thesis Proposal

Executive Summary

The proposed mechanical system design, to be conducted during the Spring 2006 Semester will focus on replacing the electric centrifugal chillers in the basemtn chiller plant with double effect steam driven absorption chillers in order to take advantage of incentives for steam driven cooling provided by the local utility, Consolidated Edison.

Thesis Proposal

Breathe Topics - The proposed mechanical redesign will directly impact the building's existing electrical and structural systems. A breathe analysis of each system will be completed to determine the changes which need to be made to these systems.

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Jessica Lucas |
This Page was last updated on May 2, 2006 , By Student Name and is hosted by the AE Department ©2005