Jessica Lucas

Mechanical Option
731 Lexington Avenue
New York, NY

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

 

Technical Assignments

Technical Assignment 1: ASHRAE STD. 62-2004 Ventilation Compliance Analysis

Technical Assignment #1 Full Report

Technical Assignment one was an investigation into the compliance of the Bloomberg Tower with ASHRAE Standard 62.1-2004. A discussion and comparison of both the ventilation rate procedure and the indoor air quality procedure, as described by this standard, is also included in the report.

Technical Assignment 2: Building Plant and Energy Performance

Executive Summary

Technical Assignment #2 Full Report

Description.

Technical Assignment 3 Existing Conditions Report

Description.

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Jessica Lucas |
This Page was last updated on May 2, 2006 , By Student Name and is hosted by the AE Department ©2005